Extension of Fire Main at Jafza North, United Arab Emirates
34km of firefighting pipe lines with aboveground pillar hydrant. The system is complete with a pumping station sited adjacent to the quay wall with direct intake to sea water.
Scope
- Detailed Design for the MEP, Structural and Hydraulic Works
- Construction Supervision