Projects

Extension of Fire Main at Jafza North, United Arab Emirates

34km of firefighting pipe lines with aboveground pillar hydrant. The system is complete with a pumping station sited adjacent to the quay wall with direct intake to sea water.

Scope

  • Detailed Design for the MEP, Structural and Hydraulic Works
  • Construction Supervision