Independent Consulting Engineering (ICE) Services For The Mass Rapid Transit Line 2 (MRT2), Malaysia
The total length of the project is 52.2 km (38.7 km elevated & 13.5 km underground). The line also includes 36 stations with two of these being underground. The Consultant is the Independent Consultant Engineer.
Scope
- Design Review
- Certification of Progress Payments
- Oversight on Tendering Process, Construction Activities and Quality & Safety Assurance