Kang Keng Airport, Cambodia.
Integrated Sdn Bhd and Sir William Halcrow and Partners (M) Ltd in a joint venture association (HSSI Halcrow) were appointed by Ariston Sdn Bhd to undertake the preliminary and detailed design of Phase 1 Development of Kang Keng Airport in Sihanoukville, Cambodia.
Scope
- Identification and preparations of all services required for topographical, geotechnical and condition survey.
- Preparation of airport development layout plant.
- Preliminary and detailed engineering design for taxiway/apron to accommodate ATR 72 aircraft at present
and Boeing aircraft in future. - Terminal building area including Cambodia architecture and all ancillary works.
- Approach roads, car park layout.
- Infrastructure drawings for rainwater drainage, water supply and sewerage.
- Mechanical and electrical services layout for the airport complex.