Projects

Kang Keng Airport, Cambodia.

Integrated Sdn Bhd and Sir William Halcrow and Partners (M) Ltd in a joint venture association (HSSI Halcrow) were appointed by Ariston Sdn Bhd to undertake the preliminary and detailed design of Phase 1 Development of Kang Keng Airport in Sihanoukville, Cambodia.

Scope

  • Identification and preparations of all services required for topographical, geotechnical and condition survey.
  • Preparation of airport development layout plant.
  • Preliminary and detailed engineering design for taxiway/apron to accommodate ATR 72 aircraft at present
    and Boeing aircraft in future.
  • Terminal building area including Cambodia architecture and all ancillary works.
  • Approach roads, car park layout.
  • Infrastructure drawings for rainwater drainage, water supply and sewerage.
  • Mechanical and electrical services layout for the airport complex.