New Low Cost Carrier Terminal 2 (LCCT2)


The new LCCT will be able to handle 30 million passengers a year with capacity for expansion of up to 45 million passengers per annum. It is located near the existing main terminal.
Scope
- Engineering Design Consultants
- Construction Supervision