Penang Bridge Widening

The existing Penang Bridge plays a key role for commuting and tourism trips and it is heavily used by cars, lories and motorcycles. Today, the level of traffic volume is higher that expected and hence it is evident that the existing bridge can no longer meet the medium to long term traffic demand. Widening of the existing bridge to fill lane traffic to meet the Government’s Economic Policies and improve the level of service on the existing bridge is essential. HSS Integrated Sdn Bhd was appointed as the Engineering Consultants to the third lane widening of the existing Penang Bridge from two lanes to three lanes.

Scope:

  • Preliminary Engineering Study,
  • Detailed Engineering Design,
  • Contract  Administration
  • Construction Supervision.