Proposed New Modification on Al Ojayli Link Road

The Ojayli Road is located approximately 25km west from Kalba, exiting from Sharjah-Kalba Road. The Client, Ministry of Infrastructure Development (MOID) has appointed Al Nuaimi Group as the Design and Build Contractor to upgrade the Ojayli road for the purpose of mitigating the flooding issues that are blocking the road access to Ojayli. Consultant HSS (CHSS), in the capacity as the Consultant for the Design and Build Contractor, has been tasked to carry out the study and design of this improvement works.

Scope:

  • Road Design (Profile, Section)
  • Signages, Markings and Safety
  • Hydrological Study
  • Hydraulics Design and Analysis
  • Design of the Box Culvert
  • Structural Design