Projects

Study, Design Improvement, Construction Operation and Maintenance of Irrigation Network & Lines, Al Abdally Farms, Kuwait

The farm areas were facing acute water shortage due to insufficient water quantity or low pressure in the irrigation line. Contract SE-126 was initiated by the Ministry of Public Works for CHSS to resolve the water Issues faced by the farmers in Abdally. CHSS evaluated the situation and planned corrective measures to the irrigation line serving the farms and provided an improved design of the irrigation system.

Scope

  • Detailed Engineering Design of Irrigation Line
  • Preparation of Contract Documentation
  • Construction Supervision