Royal Police Oman
The officers club in Muscat, Omanwas built for the Royal Oman Police. It has a built up area of approximately 30,000sqm. CHSS was engaged as the PMO and Owner’s Representative for the design and construction of the project.
Scope
- Project Management Consultancy
- Owner’s Representative
LRT System 2 – Managing Consultant and Project Management Services
Engaged by Putra Bhd as Lead Consultant in association with Halcrow and De Leuw Cather. The Putra-LRT stretched 29km and was constructed under two sections. Section 1 of the project stretched 14.1km from the Lembah Subang depot station to the Pasar Seni station. Section 2 stretched 14.9km from the Pasar Seni station to Gombak.
From Lembah Subang, the route ran in an easterly direction through the residential areas of Taman Mayang,
Paramount Garden, Section 14 and crossed into the Wilayah Persekutuan boundary after Taman Jaya in Petaling Jaya. It also passed through Kerinchi, Bangsar, Brickfields before reaching the City Centre at Pasar Seni to Gombak. The majority sections of this latter line were elevated.
Scope:
- Reviewed all applicable data, criteria, drawings and other information for design
- Coordinated design with all appropriate authorities and owner
- Developed requirements for others to carry out additional geotechnical, utilities and other investigation
- Submitted design schedule
- Developed requirements for others to carry out additional topographical or control surveys
- Project quality plan
- Prepared and submit design calculation
- Prepared all necessary construction and shop drawings
- Prepared bills of quantities
- Prepared bending schedule
- Certified all drawings
Express Rail Link (ERL) Technical Support & Project Management, Malaysia
HSSP was appointed by Express Rail Link Sdn Bhd as the Technical Support Consultant to assist in the management and implementation of the 50 km Express Rail Link project from Brikfields to KLIA, Sepang.
Scope
- Overall Project Management of ERL
- Engineering Management of the Civil & Structural Works and Railways Systems
- Planning and Cost Control
- Construction Management of the Construction Works
- Design Review of the Preliminary Engineering Works Undertaken During the KLIA
- Preliminary Engineering Study
Red Residence, Dubai Sports City
This project is developed under Middle East Developments comprises of one luxurious residential tower of 22 floors located at Dubai Sports City.
Scope:
- Project Management
UPP Security Building
The project entails the construction of security warehouse building in Abu Dhabi for UPP. The security warehouse includes a Printing Division, Administration and Security Building.
Scope:
- Project Management
Express Rail Link (ERL) - Technical Support & Project Management
HSSP was appointed by Express Rail Link Sdn Bhd as the Technical Support Consultant to assist in the management and implementation of the 50km Express Rail Link project from Brikfields to KLIA, Sepang.
Scope:
- Overall Project Management of ERL
- Engineering Management of the Civil & Structural Works and Railways Systems
- Planning and Cost Control
- Construction Management of the Construction Works.
- Design Review of the Preliminary Engineering Works Undertaken During the KLIA
- Preliminary Engineering Study