Yas Marina Hotel
Yas Marina Abu Dhabi Hotel is located within the Yas Marina Circuit, Abu Dhabi. It is the first new hotel in the world to be built over an F1 race circuit With a built up area of 85,000 square Meter. The hotel embodies various key influences and inspirations ranging from the aesthetics and forms associated with speed, movement and spectacle to the artistry and geometries forming the basis of ancient Islamic art and craft traditions, a perfect union and harmonious interplay between elegance and spectacle. The hotel has 499 Rooms, 75 suites and 7 Restaurants.
Scope :
- 3D Modelling
- Clash Detection
- Quantity Take-off
- Construction Simulation
Banyan Tree Signatures
Banyan tree is luxury service residence skyscraper nestled at KL City Centre. Banyan Tree comprises a single 55-storey tower which consists of 441 units of private residences, 51 units of service residences, and 50 luxury suites. Service and private residence are located from Level 27 to 52, while the hotel suites are located on Level 54 and 55.
Scope :
- 3D Modeling
- Clash Detection and Resolution
- Bill of Quantities
- Walkthrough
Louvre Museum
The museum has been designed as a "seemingly floating dome structure"; its web-patterned dome allowing the sun to filter through. The overall effect is meant to represent "rays of sunlight passing through date palm fronds in an oasis." The total area of the museum is approximately 24,000 square metres (260,000 sq ft). The permanent collections are house in a space of 6,000 square metres (65,000 sq ft), and the temporary collections are exhibited in an area over 2,000 square metres (22,000 sq ft). CHSS was responsible for 3D Modelling using BIM technology.
Scope :
- 3D Modelling MEP
- Clash Detection and Resolution
- Extraction of Shop drawing from the BIM Model
Abu Dhabi International Airport
84 thousand tons of steel will be used for the construction and the terminal building will have a roof area of 225.000 square meter and a total facade area of 200.000 square meter. One of the unique aspects of this prestigious project is the effective use of Building Information Modelling (BIM) which enabled the project management and progress monitoring in a 3D working environment.
Scope :
- 3D Modelling
- Clash Detection and Resolution
- 4D simulation
- 5D Costing