Aqah-Sharm Breakwater, Fujairah
The Client wanted to develop a marina to cater for two(2) super yachts in Al Aqah.
Scope
- Full Engineering Design
- Tender Services
Tajung Pelepas Port, Malaysia
The project is to update the Master Plan for Tanjung Pelapas Port to modify the aspects of the Master Plan influenced by the revised economic growth and market forecasts; provide an amended master plan including design concepts of port facilities and infrastructure, prepare cost estimates and financial analysis and provide phased outline physical development plan, recommendations and implementation program.
Scope:
- Masterplanning
Six Marinas in Island A at Deira Islands
As part of the Deira Island Project, The Palm Deira LLC is providing berthing facilities for more than 600 vessels around Island A. The Project is located on Deira Island A, north of Port Rashid and the Dubai Creek entrance.
CHSS was appointed to carry out the MEP Design (Water, Electrical, Fire, Sewage Pump out and Fire Fighting) and obtaining the necessary NOCs from relevant and applicable authorities for the six (6) Marinas and Revetment Berthing.
Scope:
- Engineering Services (Mechanical & Electrical)
- Concept Design
- Preliminary Design
- Detailed Design
- Authority Approvals
Independent Consultant Engineer Services For Mass Rapid Transit (MRT), Malaysia
The Government has decided to implement the Klang Valley Mass Rapid Transport (KVMRT) project to improve the public transport ridership and ease the urban traffic congestions.Syarikat Prasarana Negara Bhd.(SPNB) has been appointed as the asset and project owner for the Project.The first line to be implemented is the stretch from Sg.Buloh to Kajang (SBK), estimated to cost about RM 18 to 20 billion.The SBK line is 51km long, with 41.5km elevated and 9. 5km underground.There will be a total of 31 stations,out of which 7 are underground .16nos. Park & Ride facilities with multi level car parks are proposed.Some of the stations are proposed to be integrated with existing stations of KTMB, ERL, LRT, and Monorail via interchanges.
The underground portion consists of twin tunnels , 5.8m internal diameter .The tunnels are formed by using TBM’s whilst the underground stations are by cut & cover method. The underground stretch traverses through Kenny Hill and KL Limestone formations over the northern half and southern half respectively . The KL Limestone is karstic in nature and is expected to pose a major challenge for both the tunneling works and the station works.
The design works for the SBK line are ongoing and the main construction works are scheduled to commence early 2012 . The targeted completion and opening of the SBK line is early 2017 . SPNB has appointed MMC – Gamuda as their Project Delivery Partner (PDP), who would be responsible for the planning, design, procurement, construction, integration, testing and commissioning and eventual handover of the project to SPNB.
Scope
- Design Review
- Oversight on Tendering Process, Construction Activities and Quality & Safety Assurance
- Assist SPNB in completing the Project within time and cost.
Metro Viaduct Beautification
The Metro Viaduct Beautification project was undertaken for Roads & Transport Authority (RTA). This project involves the beautification for Phase 1,2 and 3 of the Red Line Metro Viaduct for approximately 18.5km from Safa Park to Trade Centre Roundabout and the VIP Terminal in Airport Road.
Scope
- Detailed Design
- Construction Supervision
- Soft and Hard Landscaping
LRT Ampang (AMG) Line Extension, Malaysia
The proposed Ampang Line Extension is approximately 17.7km in length from the existing Sri Petaling Station to the terminal station at Putra Heights. The line is fully elevated and comprises of 13 stations and 1 depot.
Scope
- Preliminary Design
- Detailed Design
- Tender Services
- Construction Supervision
Independent Consulting Engineering (ICE) Services For The Mass Rapid Transit Line 2 (MRT2), Malaysia
The total length of the project is 52.2 km (38.7 km elevated & 13.5 km underground). The line also includes 36 stations with two of these being underground. The Consultant is the Independent Consultant Engineer.
Scope
- Design Review
- Certification of Progress Payments
- Oversight on Tendering Process, Construction Activities and Quality & Safety Assurance
Elevated Guideway Structure For Light Rail Transit (LRT), Malaysia
Engaged by Putra Bhd as Lead Consultant in association with Halcrow and De Leuw Cather, the Putra – LRT network is a 29km stretch that is being constructed under two sections.Section 1 of the project stretches 14 .1km from the Lembah Subang depot station to the Pasar Seni station and will be operational by mid – September 1998 . While Section 2 will stretch 14 . 9km from the Pasar Seni station to Gombak and will be ready by 1999.
Scope
- Review all applicable data, criteria, drawings and other information for design
- Coordinate design with all appropriate authorities and owner
- Develop requirements for others to carry out additional geotechnical,utilities and other investigation
- Submit design schedule
- Develop requirements for others to carry out additional topographical or control surveys
- Prepare and submit quality plan
- Prepare and submit design calculation
- Prepare all necessary construction and shop drawings
- Prepare bills of quantities
- Prepare bending schedule
- Certify all drawings
Ipoh Padang Besar Electrified Double Tracking Project, Malaysia
HSS Integrated Sdn Bhd (HSSI) is responsible for the design of road geometric, junction, bridge, geotechnical, hydrology, drainage, road marking and road furniture, the design of electrical, design and installations,namely traffic signal and street lighting.
The consultant shall complete the detailed design for the proposed project . Detail design for the proposed project shall achieve the key objective of minimizing the construction while maintaining with the standards identified in Design Brief.
Scope
- Study,evaluate and propose for approval Road Over Bridges at all nine (9) location as stated earlier
- Realigning sections of the road to meet the specified geometric requirement and standards.
- Upgrading, widening or replacement of existing bridges to confirm to JKR standard .
- Upgrading, widening or replacement of existing drainage culverts and drainage system to confirm to JPS requirements.
- Study and analyze available soil investigation data and propose appropriate soil treatment and retaining structures.
- Upgrading or provision street lighting and traffic signal at junction/interchange and along alignment Relocation of existing utilities to the utility corridor where necessary.
Ampang (AMG) Line Extension Project, Malaysia
Syarikat Prasarana Negara Berhad (Prasarana) is the asset owner for LRT Kelana Jaya Line, Ampang Line and bus services within Kuala Lumpur with RAPID KL being the operators . Prasarana intend to enhance the LRT services by reaching and serving new areas to help alleviate traffic congestion in the city .To this end, it has proposed to extend the Ampang Line to enhance the service provided to the population of Kuala Lumpur . Prasarana has appointed HSSI to undertake the Detailed Design and Consultancy Services for the project.
Scope
- The Consultant shall provide the professional engineering (i.e. Civil and Structural Engineering, Mechanical and Electrical Engineering and System Works), architectural and quantity surveying services relating to all specialized and detailed design as well as supervision of the works.
- The general services, facilities design (conventional contract) and system design (design and build contract) shall comprise of planning and submission to relevant approving authorities, design of route alignments and guide -ways, foundations, structures, architectural designs, M&E all related infrastructure system design and the preparation of Tender Documents.
- The Consultant shall also prepare the Performance Specifications for the System Works as these Works are intended to be executed through a Design and Build Contract.