Hangar for Abu Dhabi Aircraft Technologies (ADAT)
CHSS was the Technical Support Consultant assisting in the management and implementation of all upgrading works, new construction, extension works within ADAT.
Scope
- Overall Project Management
- Engineering Management
- Planning and Cost Control
- Construction Management
- Third Party Design Review
Kuala Lumpur International Airport
Kuala Lumpur International Airport (KLIA) was constructed on a designated site at Sepang some 50 km south of Kuala Lumpur. The works for the Phase 1 was to develop an airport capable of handling 25 million passengers per annum.
Scope
- Masterplanning
- Detailed Engineering Services
New Low Cost Carrier Terminal 2 (LCCT2)
The new LCCT will be able to handle 30 million passengers a year with capacity for expansion of up to 45 million passengers per annum. It is located near the existing main terminal.
Scope
- Engineering Design Consultants
- Construction Supervision
Kang Keng Airport, Cambodia.
Integrated Sdn Bhd and Sir William Halcrow and Partners (M) Ltd in a joint venture association (HSSI Halcrow) were appointed by Ariston Sdn Bhd to undertake the preliminary and detailed design of Phase 1 Development of Kang Keng Airport in Sihanoukville, Cambodia.
Scope
- Identification and preparations of all services required for topographical, geotechnical and condition survey.
- Preparation of airport development layout plant.
- Preliminary and detailed engineering design for taxiway/apron to accommodate ATR 72 aircraft at present
and Boeing aircraft in future. - Terminal building area including Cambodia architecture and all ancillary works.
- Approach roads, car park layout.
- Infrastructure drawings for rainwater drainage, water supply and sewerage.
- Mechanical and electrical services layout for the airport complex.
Langkawi International Airport Terminal Building
Malaysia Airports Berhad (MAB) decided to redevelop the airport and its associated facilities. The design of the extension took into consideration the facilities needed up to the year 2005 as well as commercial and retail facilities. The existing Terminal Building had been extended on both sides. A 160m long underground cable trench measuring 3m wide and 1.5 deep carried the mechanical and electrical services from the plant room to the terminal building.
As civil and structural consulting engineers, HSS Integrated had the responsibility to help coordinate the project. Inspection of the works to safeguard against defects and deficiencies in the work was done with the contractor. As part of the company’s quality management policy, HSSI conducted inspection check testing of all materials and workmanship to ensure compliance with specifications and plans.
Scope
- Renovation and extension of existing terminal building
- Elevated Water Tower
- Substation
- Suction Tank
- Cable Trench and Hard Landscape Structure
- Earthworks
- Drainage
- Sewerage
- Road And Water Supply
Kuala Lumpur International Airport 2 (KLIA 2)
Preliminary & Detail Design of the Bulk Earthworks (Package EW02) for the airside surfaces, ground improvement works and drainage works.
Scope:
- Preliminary Design
- Detail Design
- Construction Supervision