Marine Works

Jewel of the Creek Development

The Project “Jewel of the Creek” is located at Port Saeed in Dubai. The site is bounded by Al Maktoum Bridge, Baniyas Road, the Floating Bridge and Dubai Creek.

Scope

  • Design Review of Marina
  • Authority NOC application and approval from Dubai Coastal  and Waterway Management
  • Construction Supervision

READ MORE

The Island Project Dubai - Marine Package

The Island Project is a new development on an existing plot of reclaimed land, which is connected to Jumeirah Beach and accessed from Jumeirah Road.

Scope

  • Review and development of the design of the project marine structures
  • Obtain Statutory Authority design approvals for the Marine Works
  • Supervise the Marine Works during the construction and defect liability period

READ MORE

Storm Water Outfall No.3 At Zone 13 In Dubai Festival City

The site storm water and lake water network system at Dubai Festival City (DFC) are designed to include the pipeline network and the associated junction/manhole structures. Hydraulic analysis and the pipeline network will have gradients matching with the design invert level for the pipeline.

Junctions/manholes are provided spanning up to 50-60m average distance for maintenance purposes designed for proper invert level drop point and collection point. The manhole structures allow the accessibility for maintenance personnel, which is designed to resist the soil and water pressure lateral loads.

Scope

  • Detailed Design of Outfall Structure
  • Obtaining NOC from Dubai Municipality Coastal and Waterway Management
  • Review of the related method statements submitted by the Contractor

READ MORE

Al Garhoud Maintenance Facility

The routine maintenance facility in Old Garhoud Bridge area has for a purpose the routine maintenance and light repair works of Abras, Water-buses, Water-taxis with dry docking and routine maintenance of Creek Ferry without Dry docking.

Scope

  • Master Planning
  • Full Engineering Design
  • Tender Services
  • Construction Supervision

READ MORE

Construction of Container Terminal No.3 Wharf and Access Bridges, Westport, Malaysia

Container terminal no.3 is part of Westport and is located at Pulau Indah Port Klang, Selangor, Darul Ehsan. Westport is a multi Terminal comprising of 9 terminals. The project involved the construction of the Container Terminal No.3 Wharf, Access Bridges and the associated infrastructure facilities.

Scope

  • Structural Design
  • Infrastructure Design
  • M & E Design
  • Construction Supervision

READ MORE

Kuantan Port Expansion of Inner Harbour Basin, Malaysia

The project involves the expansion of the existing Kuantan Port by excavating a new inner harbour basin. The expansion involves the excavation of approximately 15 million cubic meters of sand and clay to be disposed in an approved dumping ground off shore. Suitable fill was placed behind a constructed rock bund on the foreshore to create additional land for future port use. Surface infrastructure roads, site drainage and other services were provided.

Scope

  • Preliminary Investigations
  • Geotechnical Assessments
  • Dredging and Excavation Design
  • Inner Basin Shore Protection
  • Reclamation and Rock Bund Design
  • Surface Infrastructure Design

READ MORE

Dry Bulk Cargo Handling Facility

This project was part of the overall West Port Development. It involved the construction of dry bulk handling conveyor and storage facilities. The conveyor facility was 1.5 km in length.

Scope

  • Feasibility Studies
  • Economic Evaluation
  • Preliminary and Detailed Design of the Conveyor System
  • Geotechnical Investigations and Ground Treatment Design
  • Total Infrastructure and Services Design
  • Marine Structures

READ MORE

Westport Development

The project involved the overall engineering master plan, construction of general cargo/container berths, dry bulk handling conveyor, storage facilities, container yards and others in different phases

Scope

  • Overall Engineering Master Plan, Feasibility and Privatization Concept
  • Total Infrastructure and Services Design

READ MORE

Gold Souk Ferry Terminal, Dubai

Maritime Transport Department of the Roads and Transport Authority (RTA) implemented the first phase of the Public Water Transportation for Dubai. The first ferry services was launched in the lower part of the Dubai Creek from Deira City Centre to Dubai Gold Souk.

Scope

  • Design Review and Modification
  • Tender Services

READ MORE

Three Fishing Harbours Development, Dubai

Three fishing harbours in Dubai have been restored and regenerated to provide better facilities for fishermen and to encourage visitors.

The three harbours are Jumeirah 1, Umm Suqeim 1 and Umm Suqeim 2. Each consist of a fish handling area, accommodation and facilities for fishermen, and a tourist area with shops and restaurants.

Scope

  • Employer’s Representative
  • Detailed Design for the Revetment and Boat Launching Ramp
  • Construction Supervision

READ MORE